In 2023, Doranova constructed the Solidferm biogas plant at the Jokioinen research farm of the Natural Resources Institute Finland (Luke). The biogas plant in Jokioinen processes slurry, solid manure, and grass biomass in a 1,100 m³ biogas reactor. The produced biogas is upgraded into heat and electricity using a CHP unit and a separate gas […]
Solidferm
Solidferm biogas plant to Northern Finland
Doranova built a heavy duty Solidferm plant to Northern Finland, Puolanka between summer 2021 and autumn 2022. Puolanka plant is designed to process dried waste water treatment sludges as well as other high solid content materials. In addition, waste water sludges can be pumped to the reactor. Produced biogas is turned into heat and electricity […]