Biogas plant projects

Solidferm -biogas plant to Natural Resources Institute Finland

29.8.2024

In 2023, Doranova constructed the Solidferm biogas plant at the Jokioinen research farm of the Natural Resources Institute Finland (Luke). The biogas plant in Jokioinen processes slurry, solid manure, and grass biomass in a 1,100 m³ biogas reactor. The produced biogas is upgraded into heat and electricity using a CHP unit and a separate gas […]

Hardferm Biogas Plant for Nevel Oy in Juuka

29.7.2024

Doranova designed and built the Hardferm biogas plant for the energy service company Nevel Oy in Juuka over the years 2022-23, addressing a very challenging application. This Hardferm plant uses solid by-products from the adjacent Puljonki Oy’s sauce and broth production, grease trap sludge, and various auxiliary inputs. The two biggest challenges of the project […]

Solidferm biogas plant to Northern Finland

25.10.2022

Doranova built a heavy duty Solidferm plant to Northern Finland, Puolanka between summer 2021 and autumn 2022. Puolanka plant is designed to process dried waste water treatment sludges as well as other high solid content materials. In addition, waste water sludges can be pumped to the reactor. Produced biogas is turned into heat and electricity […]

Biogas plants

Novel Hardferm dry fermentation plants and traditional wet fermentation plants enable efficient biogas production.

Largest farm waste -based biogas plant to Western Finland

28.8.2020

Doranova is building a wet fermentation plant to a pig farm in Western Finland. The construction project will last 6 months and when operational, the plant will significantly reduce carbon footprint and enhance nutrition circulation of the farm.  Biogas project is executed together with German Weltec Biopower GmbH and Czech Tedom a.s., whose 120 kW […]

Hardferm dry anaerobic digestion plant to Jepua

4.1.2019

Doranova will build the first ever Hardferm biogas plant to Jepua, Finland. Hardferm biogas plants are designed for the most challenging substrates such as organic fractions of municipal solid waste (OFMWS) and farming residuals with high solid content.

Jepuan Biokaasu Oy biogas plant

1.1.2019

Jepuan Biokaasu Oy acquired a wet fermentation plant that can handle 90 000 tons of farming, abattoir and greenhouse waste per year. Upgraded biomethane is used as a traffic fuel and in industrial processes.

BioKymppi Oy biogas plant

1.1.2019

Doranova delivered in the year 2010 for the BioKymppi biogas plant a 2 x 160 kWh CHP-plant which produces electricity and heath to both the plant’s needs and for selling. Doranova also designed the gas pumping unit for the plant and in 2013 delivered yet another 160 kWh CHP plant.

Footer

Valkkistentie 2, 37470 Vesilahti
Puh: 03 3143 1111
Email: doranova@doranova.fi

LinkedIn LinkedIn Youtube

Subscribe to newsletter

Subscribe our newsletter to get updates about our upcoming projects and events.







    • Patented solutions for efficient biogas production
      • Biogas plants
      • Landfill gas solutions
      • Preparatory studies, licensing and design services

    Contact us

      Our website collects information that help us to monitor visitors. We use this information to understand how visitors use our site and to carry out necessary improvements. The information can also be used for marketing purposes. Please check how we use this information here.