Doranova built a heavy duty Solidferm plant to Northern Finland, Puolanka between summer 2021 and autumn 2022.
Puolanka plant is designed to process dried waste water treatment sludges as well as other high solid content materials. In addition, waste water sludges can be pumped to the reactor.
Produced biogas is turned into heat and electricity and utilized in nearby waste water treatment plant.