Solidferm -biogas plant to Natural Resources Institute Finland
Biogas plant projects, Biogas solutions, Solidferm, Wet fermentation plantsIn 2023, Doranova constructed the Solidferm biogas plant at the Jokioinen research farm of the Natural Resources Institute Finland (Luke). The biogas plant in Jokioinen processes slurry, solid manure, and grass biomass in a 1,100 m³ biogas reactor. The
Hardferm Biogas Plant for Nevel Oy in Juuka
Biogas plant projects, Dry fermentation plants, Hardferm, KuivamädätysDoranova designed and built the Hardferm biogas plant for the energy service company Nevel Oy in Juuka over the years 2022-23, addressing a very challenging application. This Hardferm plant uses solid by-products from the adjacent Puljonki Oy’s sauce a
Solidferm biogas plant to Northern Finland
Biogas plant projects, Biogas solutions, Solidferm, Wet fermentation plantsDoranova built a heavy duty Solidferm plant to Northern Finland, Puolanka between summer 2021 and autumn 2022. Puolanka plant is designed to process dried waste water treatment sludges as well as other high solid content materials. In addition, waste w
Largest farm waste -based biogas plant to Western Finland
Biogas plant projects, Biogas solutions, Wet fermentation plantsDoranova is building a wet fermentation plant to a pig farm in Western Finland. The construction project will last 6 months and when operational, the plant will significantly reduce carbon footprint and enhance nutrition circulation of the farm. Bioga
Hardferm dry anaerobic digestion plant to Jepua
Biogas plant projects, Biogas solutions, HardfermDoranova will build the first ever Hardferm biogas plant to Jepua, Finland. Hardferm biogas plants are designed for the most challenging substrates such as organic fractions of municipal solid waste (OFMWS) and farming residuals with high solid content.
Landfill gas collection and electricity generation system to Vietnam
Biogas solutions, Landfill gas solutionsDoranova designed, delivered and installed a landfill gas collection and utilization system which included 20 gas collection wells, separate gas lines to the pumping station, membranes and soil fillings for the old landfill, gas pumping station, gas filters, and a 1.6 MW generation capacity CHP-equipment.
Landfill gas collection and electricity generation system to Zambia
Biogas solutions, Landfill gas solutionsDoranova designed, delivered and installed the landfill gas collection and utilization system to Kitwe, Zambia. The project delivery included Doranova’s “low-cost” gas wells and lines as well as gas pumping and CHP-units.
FID measurements and action statements for landfill gas collection systems at several different landfills
Landfill gas solutionsDoranova conducts landfill gas measurement, yield simulations and analysis both in Finland and in foreign markets.
Jepuan Biokaasu Oy biogas plant
Biogas plant projects, Biogas solutions, Wet fermentation plantsJepuan Biokaasu Oy acquired a wet fermentation plant that can handle 90 000 tons of farming, abattoir and greenhouse waste per year. Upgraded biomethane is used as a traffic fuel and in industrial processes.
BioKymppi Oy biogas plant
Biogas plant projects, Biogas solutions, Wet fermentation plants, WetfermDoranova delivered in the year 2010 for the BioKymppi biogas plant a 2 x 160 kWh CHP-plant which produces electricity and heath to both the plant’s needs and for selling. Doranova also designed the gas pumping unit for the plant and in 2013 delivered yet another 160 kWh CHP plant.