• Skip to primary navigation
  • Skip to main content
  • Skip to footer

DoranovaDoranova

Uusiutuva energia ja pilaantuneet maa-alueet

  • Home
  • Company
  • Services
    • Patented solutions for efficient biogas production
    • Biogas plants
    • Landfill gas solutions
    • Preparatory studies, licensing and design services
  • News
  • Blog
  • References
  • Contact us
  • Finnish
Home / Hybrid insitu remediation at Kopli railway depot, Tallinn Estonia

Hybrid insitu remediation at Kopli railway depot, Tallinn Estonia

4.3.2016 virpi

Doranova finished 2013 Kopli railway depot contaminated soil remediation project. The total volume of the contaminated soil in the three contract areas was over 24 000 m3 with heavy concentrations of mineral oils and PAH-compounds. The challenge in the implementation was to design treatment method which can be applied to high traffic railway depot, without disturbance to normal operation. The remediation was done with the combination of Doranova’s mobile on site- treatment unit and mass exchange. The site is one of the biggest remediation sites completed in Estonia.

Kategoria: Uncategorized

virpi

Previous Post: « Consulting and permitting
Next Post: Landfill productivity system for Rosk’n Roll waste management company »

Footer

Valkkistentie 2, 37470 Vesilahti
Puh: 03 3143 1111
Email: doranova@doranova.fi

LinkedIn LinkedIn

Subscribe to newsletter

Subscribe our newsletter to get updates about our upcoming projects and events.







    • Patented solutions for efficient biogas production
      • Biogas plants
      • Landfill gas solutions
      • Preparatory studies, licensing and design services

    Contact us

      Our website collects information that help us to monitor visitors. We use this information to understand how visitors use our site and to carry out necessary improvements. The information can also be used for marketing purposes. Please check how we use this information here.